NEWMAT Australia is pleased to announce it’s contribution to the American cloud-based software company Salesforce’s new tower.
The brand new 55-storey office skyscraper, designed by Foster + Partners and located on George Street, overlooks Circular Quay and is the first-ever building in Sydney to achieve Platinum WELL Core and Shell pre-certification rating. Peaking at 263 meters, it is the tallest office building in the city, and the second-tallest building overall.
For this project, we installed three TX04 translucent membranes above all three lift lobbys. The membranes are 2.9 x 12.4mtr, 3.3 x 12.4 mtr and 2.6 x 12.4mtr, respectively, and all without seams.
Thank you to Electrolight, FREDON and their team for a great outcome.
For further information on this project or assistance on designing ceilings with Newmat, please reach out to our design team.